Self Build Photo Gallery
Check out the latest photos from the build and see all the things that have been going on around the site.

Repairing neighbour's adjoining wall
15th December 2014
Building Works

The water seems o be draining well
15th December 2014
Building Works

Roof trim and facia board
15th December 2014
Building Works

Timber battens on for cladding
15th December 2014
Building Works

A muddy building site
15th December 2014
Building Works

Ensuite - insulation blocks where pipes will go
15th December 2014
Building Works

Underfloor heating manifold cupboard
15th December 2014
Building Works

Log burner corner
15th December 2014
Building Works

Dry floor screed in the living room
15th December 2014
Building Works

Everything gets covered to make a level floor
10th December 2014
Building Works

Screed is compacted and levelled across the whole interior
10th December 2014
Building Works

Screed poured right over the heating pipes
10th December 2014
Building Works

Floor screed (closeup)
10th December 2014
Building Materials

Interior floor screed delivered and awaiting wheelbarrows
10th December 2014
Building Materials

Only a few pipes needed in the hallway
9th December 2014
Building Works

Space left without pipes in the kitchen for cupboards
9th December 2014
Building Works

All the pipes leading back to the manifold in the cupboard
9th December 2014
Building Works

Underfloor heating pipes in the living room
9th December 2014
Building Works

The heating manifold which will control the water
9th December 2014
Building Works

All the gear needed for the underfloor heating
9th December 2014
Building Works

Closeup of the trays
9th December 2014
Building Works

Underfloor heating trays across the living room
9th December 2014
Building Works

Floor insulation in the en-suite bathroom
8th December 2014
Building Works

Floor insulation in the bedroom and en-suite bathroom
8th December 2014
Building Works

Floor insulation in the dining room / kitchen
8th December 2014
Building Works

Floor insulation in the living room
8th December 2014
Building Works

Floor insulation sheets cut to size as required
8th December 2014
Building Works

Stud walls protected from damp with plastic sheeting
8th December 2014
Building Works

Base layer of sand for the whole house interior
8th December 2014
Building Works

Base layer of sand across the whole floor
8th December 2014
Building Works

Diagonal look in the corner of the room
7th December 2014
Misc

A smaller sink than I'd like, but it'll be fine
7th December 2014
Misc

Plenty of space for a decent size bath
7th December 2014
Misc

The 'good' insulation clips sourced from Screwfix
5th December 2014
Building Materials

And the buckling meant they didn't grip the wall ties very well either
5th December 2014
Building Materials

Problematic insulation clips buckling due the larger cross-section
5th December 2014
Building Materials

A completed section of wall ready for the outer skin to be laid
5th December 2014
Building Works

They are still spaced at similar intervals throughout the block work
5th December 2014
Building Works

The rough sandy surface of wall ties helps them grip the mortar
5th December 2014
Building Materials

The wall ties and insulation clips in action
5th December 2014
Building Works

Glass Fibre Reinforced Polymer (GFRP) wall ties in our walls
5th December 2014
Building Materials

Stainless steel wall tie and insulation clip
5th December 2014
Building Materials

Traditional stainless steel wall ties
5th December 2014
Building Materials

Securing it all into place
4th December 2014
Building Works

Getting the whole unit upright, before manoeuvring into position
4th December 2014
Building Works

Preparations for lifting the other front windows and french doors into place
4th December 2014
Building Works

Half of the main front windows and french doors
4th December 2014
Building Works

Bedroom and en-suite windows in
4th December 2014
Building Works

First window fitted. Big day!
4th December 2014
Building Works

Making sure the window is straight before securing
4th December 2014
Building Works

Attaching the fixing brackets to the windows
4th December 2014
Building Works

Studwork around the bathroom and cupboard
3rd December 2014
Building Works

A makeshift bench in the living room and plenty of sawdust
3rd December 2014
Building Works

The complete shape of the ceiling now visible
3rd December 2014
Building Works

Rubber membrane to protect timber from screed
3rd December 2014
Building Works

Partition wall between the bathroom and second bedroom
3rd December 2014
Building Works

Water flowing off the flat roof section nicely
3rd December 2014
Building Works

Still a few corners and trims to finish off properly
3rd December 2014
Building Works

First frosty morning after the rubber is all laid
3rd December 2014
Building Works

Hopefully this will be enough glue?
3rd December 2014
Building Works

Applying the adhesive for the rubber
3rd December 2014
Building Works

Drying off the OSB board ready to stick the rubber membrane down
3rd December 2014
Building Works

Garden path leading up to the front door
1st December 2014
Building Works

A few steps from the drive up to the path
1st December 2014
Building Works

The block retaining wall creates a space for 2 cars
1st December 2014
Building Works

Excavating the trenches for the driveway wall footings
1st December 2014
Building Works

Nail gun
24th November 2014
Building Works

Our painted facia boards fitted
24th November 2014
Building Works

Not bad work on a sunny day
24th November 2014
Building Works

Preserving the timber for the facia boards
24th November 2014
Building Materials

All the timber and insulation on display temporarily
24th November 2014
Building Works

Lots of tools required to get the job done
24th November 2014
Building Works

Lower lighting conditions in the winter months, even on a clear day
24th November 2014
Building Works

Timber upstands to retain the sedum roof trays
24th November 2014
Building Works

They don't look like much for a whole house
13th November 2014
Building Materials

They are pre-glazed so VERY heavy
13th November 2014
Building Materials

Howarth Timber provided great customer service
13th November 2014
Building Materials

The windows arriving all packaged up on the lorry
13th November 2014
Building Materials

A rather ugly gas meter box outside the front door
12th November 2014
Building Works

Electricity connection made into the meter box
12th November 2014
Building Works

And the water supplier bringing a connection from across the street
12th November 2014
Building Works

The gas supplier also connecting us to the main supply under the pavement
12th November 2014
Building Works

Connecting us to the electricity cable running under the pavement
12th November 2014
Building Works

Electricity supplier digging up the pavement
12th November 2014
Building Works

Trench ready for services to be installed
12th November 2014
Building Works

Hopefully the roof insulation will keep things toasty indoors
7th November 2014
Building Works

All the layers - ply, vapour barrier, insulation, OSB (Oriented Strand Board)
7th November 2014
Building Works

Timber edging holding the insulation in place
7th November 2014
Building Works

Insulation expanding over the 'flat' roof section
7th November 2014
Building Works

100mm Celotex insulation being cut to fit
7th November 2014
Building Works

You can get a proper feel for the ceiling height inside
21st October 2014
Building Works

Looking really solid
21st October 2014
Building Works

The porch detail and roof window for the spare bedroom
21st October 2014
Building Works

It looks like a spider's web from here
21st October 2014
Building Works

Spaces left for the Velux roof windows
21st October 2014
Building Works

The real contours of finished house are making an appearance
21st October 2014
Building Works

Lots of progress on the roof after 3 days
10th October 2014
Building Works

Some of the interior scaffolding removed, but still very wet under-foot
10th October 2014
Building Materials

Carpenters in action getting one of the roof trusses into place
10th October 2014
Building Works

Stainless steel brackets for locating trusses against the external walls
10th October 2014
Building Works

Plates marked out ready for trusses to be fixed
10th October 2014
Building Works

The first trusses go into place on the first day's work
10th October 2014
Building Works

A large delivery of timber waiting to be assembled
10th October 2014
Building Materials

Looking along the build from the scaffolding
30th September 2014
Building Works

View of the site (from standing on machinery)
30th September 2014
Building Works

Services trench awaiting arrival of water, gas, electricity and telephone
30th September 2014
Building Works

Boundary wall along the rear making progress
30th September 2014
Building Works

Lintel and drip-tray above the kitchen window
30th September 2014
Building Works

Insulating around the vertical steel columns
30th September 2014
Building Works

Blocks on top of the front steels and some attached insulation
30th September 2014
Building Works

Packs of cavity wall insulation waiting to be fixed to the blocks
30th September 2014
Building Works

Central steels which will support the roof in middle of the house
30th September 2014
Building Works

Covered back over with polythene and then soil
26th September 2014
Building Works

Filled with lots of rubble from the site
26th September 2014
Building Works

The drainage pipe leading into the hole
26th September 2014
Building Works

A loosely constructed chamber to hold the water
26th September 2014
Building Works

Soakaway hole - almost the size of the shed
26th September 2014
Building Works

Precision steel construction
25th September 2014
Building Works

Welding some joints
25th September 2014
Building Works

1.. 2.. 3.. lift!
25th September 2014
Building Works

A few minor adjustments
25th September 2014
Building Works

Using a bit of good old-fashioned elbow grease
25th September 2014
Building Works

Checking that everything is level
25th September 2014
Building Works

Lifting one of the I-Beams into place
25th September 2014
Building Works