More of the steels have arrived (exciting!)
25th September 2014
Building Materials

Padstones to support steels around large windows and french doors
25th September 2014
Building Works

Larger lintel for wider opening
25th September 2014
Building Works

Hallway door lintel and padstone to support steel 'I' beam
25th September 2014
Building Works

Window and door lintels (bedroom and en-suite)
25th September 2014
Building Works
![Howarth window colour samples (paint [left], stain [right]) with K-Rend sample](https://www.selfbuildblog.org/images/uploads/entries/85/howarth_window_colour_samples__small.jpg)
Howarth window colour samples (paint [left], stain [right]) with K-Rend sample
22nd September 2014
Building Materials

Photoshop-ed Slate Grey painted window mockup
22nd September 2014
Building Materials

Photoshop-ed Light Oak painted window mockup
22nd September 2014
Building Materials

Light Grey painted frame mockup
22nd September 2014
Building Materials

Light Oak stain frame mockup
22nd September 2014
Building Materials

The shower cubicle in the en-suite is taking shape
15th September 2014
Building Works

Steel columns being encased within the cavity walls
15th September 2014
Building Works

It's great to see actual doorways inside the house now
15th September 2014
Building Works

Concrete lintels going in above the internal doorways
15th September 2014
Building Works

Living room wall coming up too
15th September 2014
Building Works

Galvanised steel lintel in over the spare room window
15th September 2014
Building Works

Rear wall almost at full height
15th September 2014
Building Works

Two of the steels will be hidden within the block walls
10th September 2014
Building Works

Blocks built around the base of the steels
10th September 2014
Building Works

Coated with bitumen to help prevent corrosion
10th September 2014
Building Works

Bolted to the foundation using four bolts and resin adhesive
10th September 2014
Building Works

These will support the upper wall and roof above the windows and doors
10th September 2014
Building Works

Three vertical steels across the front
10th September 2014
Building Works

Everything is very grey on site - looking forward to some colour
5th September 2014
Plot

The back alley is now "scaffolding alley"
5th September 2014
Building Works

Electric meter box in
5th September 2014
Building Works

Blocks laid out ready for bring the rear wall up higher
5th September 2014
Building Works

Scaffolding structure
5th September 2014
Building Works

More blocks ready for action
5th September 2014
Building Works

Looking through the Front Door to the back of the house
5th September 2014
Building Works

Scaffolding erected to build house wall and rear boundary wall
5th September 2014
Building Works

View of whole house with scaffolding up
5th September 2014
Plot

Looking across the top of the whole house
3rd September 2014
Building Works

Looking out of the main bedroom window
3rd September 2014
Building Works

The back alley!
3rd September 2014
Building Works

Spare bedroom window - it looks huge
3rd September 2014
Building Works

Drainage piping come from the front-door side of the house
3rd September 2014
Building Works

Main bedroom window and the drainage from the downpipe
3rd September 2014
Building Works

Beginnings of the internal walls
24th August 2014
Building Works

Damp proof plastic strip at Finished Floor Level
24th August 2014
Building Works

Insulation sheets held in place by the wall tie clips
24th August 2014
Building Works

Expansion joint in the house to allow movement
24th August 2014
Building Works

Back alley separating the house and the retaining wall
24th August 2014
Building Works

Rear wall coming up 5 courses
24th August 2014
Building Works

Looking down on the build
24th August 2014
Building Works

Position of the steel in the middle of the living room
17th August 2014
Building Works

Damp proof membrane remains exposed
17th August 2014
Building Works

The concrete is solid despite the rain
17th August 2014
Building Works

Blocks loaded out ready for the house walls
17th August 2014
Building Works

Kitchen layout unit labels
16th August 2014
Drawings

Kitchen unit layout block dimensions
16th August 2014
Drawings

The birds eye view
16th August 2014
Drawings

A great kitchen visualisation tool for customers
16th August 2014
Drawings

3D renderings by Wickes
16th August 2014
Drawings

One of our many planning sketches
16th August 2014
Drawings

A wood or bamboo worktop works well
16th August 2014
Products

We like the Metro tiles
16th August 2014
Products

Nice under cabinet lighting
16th August 2014
Products

Integrated handles to keep the clean lines
16th August 2014
Products

Wickes Caledonia contemporary kitchen
16th August 2014
Products

All poured and setting nicely
14th August 2014
Building Works

Putting the finishing touches to slab
14th August 2014
Building Works

One room filled and being levelled
14th August 2014
Building Works

Concrete being delivered for pouring
14th August 2014
Building Works

Concrete pump lorry with it's huge arm and hose
14th August 2014
Building Works

The pump lorry right up on-site
14th August 2014
Building Works

Hopefully it wont rain overnight, otherwise it'll be a swimming pool
13th August 2014
Building Works

Damp proof membrane will have concrete poured on top
13th August 2014
Building Works

Complete plastic layer over the whole foundation
13th August 2014
Building Works

Things are looking really tidy at this stage
12th August 2014
Building Works

The sand layer makes it easy to see the outline
12th August 2014
Building Works

Mains water in (black) and waste water out (brown)
12th August 2014
Building Works

Final loads if ballast filling in the surrounding blocks
12th August 2014
Building Works

Looking across the site
8th August 2014
Building Works

Multi-directional access chamber
8th August 2014
Building Works

Pipes held in placed until the concrete is poured over the top
8th August 2014
Building Works

Sand waiting to be spread and compacted on the ballast
8th August 2014
Building Works

Looking down the hallway
8th August 2014
Building Works

The pipes will a few inches below ground (probably patio slabs)
8th August 2014
Building Works

Drainage pipes from the bathroom and en-suite
8th August 2014
Building Works

The house starting to take shape on the plot
7th August 2014
Building Works

We can test walking down the hall into the house
7th August 2014
Building Works

A layer of ballast sits on top of the foundations and sub-soil
7th August 2014
Building Works

Outlines of rear rooms plus living rooms end wall
7th August 2014
Building Works

Finished pile of 440 cut blue engineering bricks
6th August 2014
Building Materials

A nice 45-degree cut brick
6th August 2014
Building Materials

The water spray cools the saw blade and reduces dust
6th August 2014
Building Materials

It's nice to be working in sunshine for a change
6th August 2014
Building Materials

Oli trying out his new office (to be)
29th July 2014
Misc

Ken being very precise about get this block spot on
29th July 2014
Building Works

And this is the 2nd house block in place
29th July 2014
Building Works

1st house block laid
29th July 2014
Building Works

Cutting bricks, for topping the boundary wall
24th July 2014
Misc

Our future garden shed
24th July 2014
Misc

Home for the builders for a few months
24th July 2014
Misc

We have a new site office (Santa's grotto)
24th July 2014
Misc

A few more blocks yet to go and then a fence on top
24th July 2014
Building Works

Retaining the neighbour's land
24th July 2014
Building Works

View from the neighbour's garden (our house at the moment)
24th July 2014
Building Works

Scale drawings of the brick arrangements
14th July 2014
Drawings

Testing layout options for topping off the boundary walls
14th July 2014
Building Materials

A couple of courses of 'blues'
14th July 2014
Building Works

Starting the retaining wall along the neighbour's boundary
14th July 2014
Building Works

Steel reinforcing bars slow getting integrated into the structure
14th July 2014
Building Works

Lots of progress on rear retaining wall
14th July 2014
Building Works

Filled and levelled and setting already
8th July 2014
Building Works

Trenches filled at the end of the day
8th July 2014
Building Works

View of the occasion from across the street
8th July 2014
Building Works

Reinforcing steel work starts to disappesr
8th July 2014
Building Works

It slowly flows along like grey lava
8th July 2014
Building Works

First load of concrete goes into the trenches
8th July 2014
Building Works

Concrete pump reaching out across the site
8th July 2014
Building Works

Panoramic view showing the foundation trenches and steel cage
7th July 2014
Plot

Who's this geeza?
7th July 2014
Building Works

Looking down on the plot from the neighbouring property
7th July 2014
Building Works

View along the rear boundary retaining wall structure
7th July 2014
Building Works

Foundation trench with height marker for concrete pour
7th July 2014
Building Works

Closeup of the reinforcing steel cage
7th July 2014
Building Works